Guys, if the coach says something you really shouldnt **** with the program and make it your own.
If you were doing PPP would you leave squats til last and do power cleans instead?
this is a slow lift program which is built around the squat. even if it only adds 0.0025kgs more to the squat (which would make it more than worth it imo) it should be left as is.
If you were doing PPP would you leave squats til last and do power cleans instead?
this is a slow lift program which is built around the squat. even if it only adds 0.0025kgs more to the squat (which would make it more than worth it imo) it should be left as is.