I have a dam due to be dug out deeper and wider and 1 permanent creek plus 5 seasonal creeks.
The land will can hold 130 head of sheep but the previous owners sheep are staying since they still owner the neighbouring blocks plus I dont feel like mowing it every sunday.
Im having a cabin built by Cabin Kits Galore and will later construct a machinery shed to lock up my toys.
in the meantime I am bringing in an earthmover to build a driveway to avoid this: