The program posted here is flawed. we abandoned it and threw it away. too many misses too early.
we have been working off a new program, longer duration, more sets, smaller jumps, totally different, forgot to mention that on here. The original thread is gone off ns.com
Anyway, we do assistance work on the same day.
The program is designed for lifters who can clear 140/100/180.
Its based on each lift performed once a week. A fourth day can be set aside for those with a weak lift. Dim deadlifts 185kg and benches 105kg at 70kg, his squat is a poor 130kg, so he squats twice a week.
Your close enough to do the program, but it has to be done in its entirety, you cant just pick and choose bits and pieces.
I have found that some clients are over enthusiastic with their predicted lifts.
The program tells you where your at, it sorts everyone out pretty quick smart.
I'll wait another couple of weeks before I announce anything with this program. I want to make sure the bugs are ironed out.
When completed, I believe it has the ability to be a life long training plan. It incorporates 44 weeks of heavy lifting with 8 weeks of "other" work.
It can take a lifter from 50kg to 350kg.
I will be working on a plan for MP which will be twice a week with a much different rep range and a powerclean one that will need 3 times a week training with different set/rep ranges.
Before I introduce anything like this I test it on my lifters. The easiest thing in the world is to say do this, it will work or your weak. Some very strong lifters failed very early at PTC on the original plan.
stay tuned.